Property Map
Street View
Courtesy of Thomas James Real Estate Services, Inc,, Gloria Lee 510-378-7987
Description
Unique opportunity to unlock the advantages of buying an in-progress home built by Thomas James Homes. When purchasing this home, you will benefit from preferred pricing, designed personalization, and more. Estimated completion of construction is Summer 2025. Distinguished 5-bedroom, 5.5-bathroom Craftsman-style home in a prime Central Menlo Park location. Just inside the front porch is the great room that includes a fireplace and large doors that lead to the covered patio. At the heart of the main floor is the gourmet kitchen hosting an island, prep station, walk-in pantry, and dining area. Continue through the main floor to the flex room, office, and junior suite with en suite bathroom. Ascend the stairs to the versatile loft, laundry room with sink and storage, and 3 additional secondary bedrooms with en suite bathrooms. Enjoy the luxurious grand suite, which includes a spa-like bath and walk-in closet. *Illustrative landscaping shown is generic and does not represent the landscaping proposed for this site. All imagery is representational and does not depict specific building, views or future architectural details. Photos taken November 14, 2024
Property Details and Features
Listing
- Source: MLSListings
- Listed on 2024-11-08 00:00:00
Lot
- Max Area: 22109.00
- Max Area Units: Square Feet
- Surveyed
Bedrooms
- 5 bedrooms
- Ground Floor Bedroom
- Primary Suite / Retreat
- Walk-in Closet
Bathrooms
- 5 full bathrooms
- 1 half bathroom
- Double Sinks
- Full on Ground Floor
- Primary – Stall Shower(s)
- Showers over Tubs – 2+
- Stall Shower
- Stone
- Tile
Location
- County: San Mateo
Building
- Built in 2024
- 5,044 square feet
- 5,044 living square feet
- Style: Craftsman
- Building type: Detached
Dining Room
- Breakfast Bar
- Eat in Kitchen
Family Room
- Kitchen / Family Room Combo
Additional Rooms
- Great Room
- Laundry Room
- Office Area
- Storage
- Other
Amenities
- High Ceiling
- Walk-in Closet
Fireplaces
- 1 fireplace (minimum)
- Living Room
Floors
- Hardwood
- Tile
Foundation
- Concrete Slab
- Other
Roof
- Composition
- Shingle
Cooling
- Central AC
- Multi-Zone
Kitchen
- Countertop – Quartz
- Dishwasher
- Exhaust Fan
- Freezer
- Garbage Disposal
- Hood Over Range
- Island with Sink
- Microwave
- Oven Range – Gas
- Pantry
- Refrigerator
Laundry
- Inside
- Upper Floor
Garage
- 3 garage spaces
- Attached Garage
Water Features
- Individual Water Meter
- Irrigation Connected
- Public
Heating
- Forced Air
Utilities
- Individual Electric Meters
- Individual Gas Meters
- Public Utilities
Sewer
- Sewer – Public
- Sewer Connected
Property
- Neighborhood
- Zoning: R10010
- Back Yard
- Fenced
- Horse property?: No
Fence
- Complete Perimeter
- Fenced
- Surveyed
- Wood
Schools
- Elementary school: Oak Knoll Elementary
- Elementary school district: Menlo Park City Elementary
- Middle school: Hillview Middle
- High school: Menlo-Atherton High
- High school district: Sequoia Union High
Please Log In to continue
Please log in
Listings last updated on December 3, 2024 12:04PM.